Coastworker 30 Mk 2
Page 5: Nearly finished outside

The starboard side of the hull showing the scuppers and rubbing strake.

Access hatch to area under aft deck and the rudder gear. This hatch has
been
designed to seal flush with the deck. Typical of the attention to detail that
Graham has
put into this vessel.

'Hydrive' hydraulic rudder control

Bearing support at aft end of skeg.

Note the splash rail welded at the chine.

Sliding side door to steering controls and salon
Page [ 1 ] [ 2 ] [ 3 ] [ 4 ] [ 5 ] [ 6 ]