Page 3 : Planking

 


The first strips of ply laid.


Bow section, both sides.


Working alternately down the hull


Filling the last few sheets of the first layer.


All ready for the second layer. The transom has been attached 
and the first layer has been faired


Here we see the second layer laid on


A close up of the second layer of ply being epoxied over the first layer


Here you can see the second layer being laid over the first. Note also the
flat of the keelson where the keel structure will later be attached.

 

Page [ 1 ] [ 2 ] [ 3 ] [ 4 ] [ 5 ]

Home