Page 3 : Adding the Ballast


Wayne had made molds of the sections of the keel and cast solid lead blocks.


With the addition of a small amount of molten lead the ballast is secured.


Spray on polyurethane foam. The best qualities but also the most expensive and
 most work of all the insulation options available.

The deck and cabin top construction photos plus interior fitting out
photos will be posted on this page and pages 4, 5, 6 and 7 in the near future.

 

Page [ 1 ] [ 2 ] [ 3 ] [ 4 ] [ 5 ] [ 6 ] [ 7 ] [ 8 ] [ 9 ]

Home