Spray 22 

This Spray 22 is being built using  the cold molded wood epoxy 
method by Nic in Wisconsin, USA. 

Page 1...... Building the Frames
Page 2...... Some of the many little jobs.
Page 3...... Standing and fairing the frames
Page 4......

Page 1 : Building the Frames.


In a climate like this some form of shelter is a necessity


The builder with strongback parts and frames.


The Strongback


The work area with lofting table


There is no need for heavy lifting equipment with this design.


The first frame in place


The Spray 22 is Nic's second boatbuilding project. His first is shown above.
A strip plank, sailing, bass boat.

 