Page 3  :  Standing and fairing the frames


Frames with floors attached and bulkheads ready for hoisting onto the strongback


Building the strongback


As with most outdoor building some way must be found to make the strongback level.
Here old telephone poles are going to be used.


The frames being braced firm at the correct distance apart.


Permanent and temporary frames standing


Note the notches in the frames to take the keelson


Another milestone. The stem fitted in position.

 