Spray 28 (stretched to 31 ft)
Page 3: Deck and cabin plating

Ready to turn over. Note the framework pre tacked on to support the
boat level after it has been turned over.

Haff over showing the strongback still in position.

Here the strongback has been removed. The headstocks still remain.

Deck and cabin beams welded into position.

Plating has begun


The cockpit under construction

Looking forward with the cockpit fully plated.

Looking aft with the cockpit fully plated.

The Foredeck area