Spray 36

Page 2:   Standing the Frames


Concrete pads laid and cradle welded up.


The frames have been tacked together ready to be erected once keel and 
hull bottom plate have been laid.


Floor webs being tacked to keel.


Floor webs in place showing lightening holes, notches for sole supports and stringers.


Bulkheads put into position and braced.


Frames and bulkheads starting to be erected.


All bulkhead and frames standing, stringers slotted into place and tacked.


Cockpit tacked into place.

 